Due to the fact that climate and neighborhood were not the limiting factors for the location of the villa, the east of the land, which used to be a place of another building in the past, was allocated for this purpose. With the aim of minimizing intrusion and seizure of the area, the connection surface of the villa to the land was limited to the same rectangle of the old building dimensions. To meet the demands of the employer two console volumes were added to the initial core of the project at ground level and the first floor without connecting to the ground.
As a technically competent architect with over 15 years of professional experience, he has been involved in different stages of architectural projects including conception of preliminary design ideas, schematic design and design development, as well as producing submittal packages, visual presentations, construction documents, layouts and details through close dialogue with clients, producers, and other engineers. He believe that his communication skills, public relations and problem-solving experience, combined with his background in related software, and his ability to research, schedule and coordinate design in various stages of the project, has made him an employee to depend on, and a key team member.
As a technically competent architect with over 15 years of professional experience, we have been involved in different stages of architectural projects including the conception of preliminary design ideas, schematic design and design development, as well as producing submittal packages, visual presentations, construction documents, layouts and details through close dialogue with clients, producers, and other engineers. We believe that our communication skills, public relations, and problem-solving experience, combined with our background in related software, and our ability to research, schedule, and coordinate design in various stages of the project, have made us a firm to depend on, and a key team member.