DESIGN NAME: Kamakura
PRIMARY FUNCTION: Golf Club House
INSPIRATION: We planned to provide a “third place” for individuals to enjoy golf in addition to group golf. It is a clubhouse equipped with a new way of spending time that enriches club life itself. We have set up Japan's first mobile workplace. It is possible to work in between golfing and play golf in between work at will. The clubhouse is equipped with facilities for remote work and also offers a luxurious place to read or study while enjoying the beautiful scenery. A full-fledged fitness room is also available.
UNIQUE PROPERTIES / PROJECT DESCRIPTION: Impressive focal points were expressed inside and out.
One of the symbols to carry on the founding spirit was to build stone walls on the new facade and interior in the castle concept architecture. The effect was to create a design icon that connects the outside and the inside. Another symbol to carry on the founding spirit was the boldly cut stump of a large zelkova tree, which has been preserved since the course site, and placed in the atrium like an object in a Japanese garden, creating a narrative scene that confronts the past and future by contrasting the minimalist chandelier.
OPERATION / FLOW / INTERACTION: Provide an environment of club life where members can enjoy golf and rich moments at the same time.
PROJECT DURATION AND LOCATION: Completed from March 2021 to January 2023.
This project is a complete renewal of the existing location of the current clubhouse.
Location: Kamakura City, Kanagawa Prefecture.
FITS BEST INTO CATEGORY: Interior Space and Exhibition Design
|
PRODUCTION / REALIZATION TECHNOLOGY: The entire clubhouse draws natural water from underground and uses it for everything from beverages to bathroom toilets after distillation. For this purpose, a large distillation facility has been installed at great expense. Because the facility is located on a hill, it is prepared for water outages, and the entire building can be used with peace of mind.
SPECIFICATIONS / TECHNICAL PROPERTIES: Construction area
Renovation area of earthquake-resistant structure All floors and rooftop
Area of interior renovation 1F and 2F total 1320m2
TAGS: topofthehill, scenicview, golfcourse, clubhouse, clublife, stonewall, kamakura,
RESEARCH ABSTRACT: Proposal for a new club life in golf course clubhouse.
CHALLENGE: Because it was during the Corona pandemic, we were able to patiently negotiate with a stone mason to procure the masonry stone to represent the walls of the castle-like design icons and the difficulties in construction and were able to excavate and complete the building.
ADDED DATE: 2024-06-30 07:33:46
TEAM MEMBERS (1) : Hijung Kasuya
IMAGE CREDITS: Photo / Astushi Nakamichi / Nacasa & Partners inc.
Interior & Exterior Designer / Hijung Kasuya / CONTEMPORARY MARKET.
|